• Known annual overhead $120,00.00
• Number of months in a year 12
• $120,000.00 known overhead divided by
12 months in a year = $10,000.00
Therefore:
• The monthly overhead is $10,000.00.
Or:
• $120,000.00 known overhead divided by
52 weeks in a year = $2,308.00
Therefore:
• The weekly overhead is $2,308.00.