• Known overhead for year $120,000.00
• Present overhead markup 15%
• $120,000.00
.15 = $800,000.00 of material and labor.
• Apply overhead of 15%.
$800,000.00 material and labor
120,000.00 annual overhead
$920,000.00 cost of work is needed to pay for overhead