Page 34 - Electrical Price & Labor Units Guide
P. 34

08-02-21
      10-4
                                                        ALUMINUM RIGID CONDUIT

                                                                Average        Suggested   LABOR   HOURS
                               Description     Lbs/100’   Cost    Resale      (0-6’)   (6-10’)  (10-15’)  (15-20’)

                             1/2”                30     114.87     205.75      2.00    3.00     4.00     5.00
                             3/4”                40     140.65     273.95      3.00    4.00     5.00     6.00
                             1”                   59    203.66     390.00      4.00    5.00     6.00     7.00
                             1-1/4”               80    271.79     512.50      5.00    6.00     8.00     9.00
                               1-1/2”             96      336.70   634.75      6.00    8.00     9.00    11.00
                             2”                    129   469.31    848.00      7.00    9.00     11.00   12.00
                             2-1/2”              205     711.74   1,341.85     8.00   10.00    12.00    14.00
                             3”                    268   975.83   1,762.65     9.00    11.00   14.00    16.00
                               3-1/2”             321      1,122.08   2,115.50     10.00   13.00   15.00   18.00
                             4”                 382      1,329.34   2,506.25     12.00   15.00   18.00   21.00
                             5”                 522      1,817.88   3,586.75     14.00   18.00   21.00   25.00
                             6”               678        2,392.97   4,721.50     16.00   20.00   24.00   28.00

                                                    ALUMINUM RIGID CONDUIT ELBOWS

                                                                Average        Suggested   LABOR   HOURS
                               Description     Lbs/Ea.   Cost     Resale     (0-6’)   (6-10’)  (10-15’)  (15-20’)

                             1/2”                 .3    7.32        21.65      0.15     0.19     0.23     0.26
                             3/4”                  .4   9.94        29.40      0.20     0.25     0.30     0.35
                             1”                    .7   13.85       41.00      0.25     0.31     0.38     0.44
                             1-1/4”               1    22.02        65.15      0.30     0.38     0.45     0.53
                               1-1/2”              1.5     29.30    86.75      0.33     0.41     0.50     0.58
                             2”                   2.4    41.13     127.50      0.35     0.44     0.53     0.61
                             2-1/2               4.3     72.69     215.00      0.45     0.56     0.67     0.79
                             3”                    7.6   112.27    332.00      0.55     0.69     0.83     0.96
                             3-1/2”              10     112.27     518.00      0.65     0.81     0.98     1.14
                             4”                    12   207.63     615.00      0.75     0.94     1.13     1.31
                             5”                   25    613.91    1,816.00     0.90     1.13     1.35     1.58
                             6”                    39   849.39    2,513.00     1.80     2.25     2.70     3.15

                                                  ALUMINUM RIGID CONDUIT COUPLINGS
                                                                Average        Suggested   LABOR   HOURS
                               Description            Cost        Resale     (0-6’)   (6-10’)  (10-15’)  (15-20’)
                             1/2”                      2.32         7.15       0.04     0.05     0.06     0.07
                             3/4”                      3.51        10.75       0.05     0.06     0.08     0.09
                             1”                        4.64        14.25       0.06     0.08     0.09     0.11
                             1-1/4”                      5.67      17.50       0.07     0.09     0.11     0.12
                             1-1/2”                    6.55        20.00       0.08     0.10     0.12     0.14
                             2”                        9.30        28.50       0.09     0.11     0.14     0.16
                             2-1/2”                   20.94        64.25       0.10     0.13     0.15     0.18
                             3”                       27.32        84.00       0.10     0.13     0.15     0.18
                             3-1/2”                   37.54       115.25       0.12     0.15     0.18     0.21
                             4”                       45.19       138.75       0.13     0.16     0.20     0.23
                             5”                      152.60       468.50       0.13     0.16     0.20     0.23
                             6”                      238.18       731.25       0.15     0.19     0.23     0.26
















                                           MATERIAL PRICES AND LABOR UNITS FOR CONDUIT ARE PER 100 FT.
                                    MATERIAL PRICES AND LABOR UNITS FOR ELBOWS AND COUPLINGS ARE PER EACH
      NPG/NSG                   AVERAGE COST COLUMN IS A NATIONAL AVERAGE AND SHOULD BE VERIFIED FOR YOUR AREA
      1-4                                COPYRIGHT © 1996-2021 by ELECTRICAL RESOURCES, INC.
   29   30   31   32   33   34   35   36   37   38   39