Page 145 - Electrical Price & Labor Units Guide
P. 145

06-28-21
                                                                                                                 50-1
                                                           OCAL-BLUE PVC COATED CONDUIT

                                                                       Average        Suggested   LABOR   HOURS
                                    Description    Cat. No.   Cost       Resale     (0-6')   (6-10')   (10-15')  (15-20')

                                    1/2"       COND1/2-G          625.66   796.00     4.00    5.00     6.00     7.00
                                    3/4"           COND3/4-G         725.23   922.00    5.00   6.00    8.00     9.00
                                    1"          COND1-G            938.91   1,194.00     6.00   8.00   9.00    11.00
                                    1-1/4"     COND11/4-G       1,187.65   1,511.00    8.00   10.00    12.00   14.00
                                    1-1/2"       COND11/2-G   1,443.88   1,837.00     10.00   13.00    15.00   18.00
                                    2"             COND2-G          1,885.07   2,397.00    12.00   15.00   18.00   21.00
                                    2-1/2"     COND21/2-G       2,853.18   3,630.00    15.00   19.00   23.00   26.00
                                    3"              COND3-G         3,603.50   4,582.00    18.00   23.00   27.00   32.00
                                    3-1/2"              COND31/2-G    4,407.19   5,604.00    20.00   25.00   30.00   35.00
                                    4"                COND4-G        5,193.98   6,604.00     25.00   31.00   38.00   44.00
                                    5"          COND5-G           9,206.77   11,707.00    30.00   38.00   45.00   53.00
                                    6"         COND6-G     12,616.56    16,042.00   36.00    45.00     54.00   63.00

                                                           OCAL-BLUE PVC COATED ELBOWS

                                                                       Average        Suggested   LABOR   HOURS
                                    Description    Cat. No.   Cost       Resale      (0-6')   (6-10')   (10-15')  (15-20')

                                    1/2"        ELL1/2-G      26.44        32.93     0.25     0.31     0.38     0.44
                                    3/4"               ELL3/4-G       27.75   34.18     0.30     0.38     0.45     0.53
                                    1"                  ELL1-G        31.48   39.20     0.35     0.44     0.53     0.61
                                    1-1/4"             ELL11/4-G         38.68   48.17     0.40     0.50     0.60     0.70
                                    1-1/2"              ELL11/2-G     47.52   59.19     0.50     0.63     0.75     0.88
                                    2"                  ELL 2-G     66.33   82.60     0.65     0.81     0.98     1.14
                                    2-1/2"              ELL21/2-G     124.97   155.64     0.85     1.06     1.28     1.49
                                    3"                   ELL3-G    199.75   248.75     1.00     1.25     1.50     1.75
                                    3-1/2"              ELL31/2-G     262.08   326.38     1.30     1.63     1.95     2.28
                                    4"                    ELL4-G   285.18   355.14     1.60     2.00     2.40     2.80
                                    5"                ELL5-G       687.24   855.84     2.00     2.50     3.00     3.50
                                    6"          ELL6-G      1,251.97     1,559.12    3.00     3.75     4.50     5.25

                                                          OCAL-BLUE PVC COATED COUPLINGS

                                                                       Average        Suggested   LABOR   HOURS
                                    Description    Cat. No.   Cost       Resale     (0-6')   (6-10')   (10-15')  (15-20')
                                    1/2"             CPL1/2-G        7.14   9.17      0.05     0.06     0.08     0.09
                                    3/4"             CPL3/4-G        7.47   9.60      0.06     0.08     0.09     0.11
                                    1"              CPL1-G         9.72   12.47       0.07     0.09     0.11     0.12
                                    1-1/4"        CPL11/4-G           11.31   14.51     0.09     0.11     0.14     0.16
                                    1-1/2"           CPL11/2-G         13.47   17.29     0.10     0.13     0.15     0.18
                                    2"                CPL2-G       19.70   25.29      0.12     0.15     0.18     0.21
                                    2-1/2"              CPL21/2-G     48.76   62.59     0.14     0.18     0.21     0.25
                                    3"                 CPL3-G       59.21   76.01     0.15     0.19     0.23     0.26
                                    3-1/2"          CPL31/2-G          75.98   97.53     0.16     0.20     0.24     0.28
                                    4"                 CPL4-G      88.82   114.02     0.18     0.23     0.27     0.32
                                    5"                CPL5-G       289.38   371.48     0.19     0.24     0.29     0.33
                                    6"          CPL6-G       323.25       414.96     0.20     0.25     0.30     0.35
















                                                  MATERIAL PRICES AND LABOR UNITS FOR CONDUIT ARE PER 100 FT.
                                            MATERIAL PRICES AND LABOR UNITS FOR ELBOWS AND COUPLINGS ARE PER EACH
              NPG                       AVERAGE COST COLUMN IS A NATIONAL AVERAGE AND SHOULD BE VERIFIED FOR YOUR AREA
              5-1                               COPYRIGHT © 1996-2021 by ELECTRICAL RESOURCES, INC.
   140   141   142   143   144   145   146   147   148   149   150